Projects

Projects

Projects

Driving Innovation Through

Real-World Applications

At CapyBara Energy, we are deploying our storage systems in real-world projects that demonstrate their scalability, performance, and resiliency. These installations showcase the versatility of our technology and its ability to support a wide range of power system needs

Third-Party Validation at Sandia National Labs (2025)

Third-Party Validation at Sandia National Labs (2025)

Our supercapacitor module is undergoing rigorous testing by experts at Sandia National Labs

This validation ensures that our technology meets industry standards for safety, reliability, and performance

The results will guide the deployment of larger-scale systems

Human-Free Charging for Robotics at Tufts University (2024)

Human-Free Charging for Robotics at Tufts University (2024)

In partnership with Tufts University’s Human-Robot Interaction Laboratory, we are powering remote charging stations for Boston Dynamics “Spot” robots

These systems enable human-free, off-grid charging for robotics in critical applications such as industrial inspection and search-and-rescue operations

Remediation Site Requiring Grid Resilience (2025)

Remediation Site Requiring Grid Resilience (2025)

We are deploying a 1 MWh grid-tied system to support power delivery for a Con Edison remediation site, demonstrating dependable performance in locations with inconsistent supply

Manufacturing Facility (2026)

Manufacturing Facility (2026)

A state-of-the-art production facility is being constructed in Woburn, MA to support expanding system deployment. It will integrate localized carbon processing, modular assembly workflows, and R&D infrastructure for future development

Cumulative Storage Deployment Timeline

By 2030, CapyBara Energy will have deployed over 3GWh of energy storage systems globally, supporting a wide range of applications from residential to grid-scale energy storage projects