Projects

Projects

Projects

Driving Innovation Through

Real-World Applications

At Capybara Energy, we are deploying our storage systems in real-world projects that demonstrate their scalability, performance, and resiliency. These installations showcase the versatility of our technology and its ability to support a wide range of power system needs

Third-Party Validation at Sandia National Labs (2026)

Third-Party Validation at Sandia National Labs (2026)

Our technology has completed independent testing and validation at Sandia National Laboratories.

Want to know how it works? Don’t take our word for it. Read the report.

https://www.osti.gov/biblio/3943100

Human-Free Charging for Robotics at Tufts University (2026)

Human-Free Charging for Robotics at Tufts University (2026)

In partnership with Tufts University’s Human-Robot Interaction Laboratory, we are powering remote charging stations for Boston Dynamics “Spot” robots

These systems enable human-free, off-grid charging for robotics in critical applications such as industrial inspection and search-and-rescue operations

1MWh system directly supporting Remediation equipment (2026)

1MWh system directly supporting Remediation equipment (2026)

We are deploying a 1 MWh grid-tied system to support power delivery for a legacy Con Edison remediation site, demonstrating dependable performance in locations that need resilient energy storage

Manufacturing Facility (2027)

Manufacturing Facility (2027)

A state-of-the-art production facility is being constructed in Woburn, MA to support large-scale manufacturing. It will integrate localized carbon processing, semi-automated assembly, and product durability testing

Cumulative Storage Deployment Timeline

By 2030, CapyBara Energy will have deployed over 3GWh of energy storage systems globally, supporting a wide range of applications from residential to grid-scale energy storage projects