
June 2024
CapyBara Energy was selected by the U.S. Department of Energy’s LIFTOFF program to deploy a grid-tied energy storage system focused on power resilience for critical site operations.
The project includes a 1 MWh storage system integrated with on-site generation to ensure reliable, continuous power for remediation activities operating in a constrained grid environment. The system is designed to maintain operations during grid instability and support long-duration site needs of critical infrastructure.
This deployment validates CapyBara Energy’s technology for infrastructure resilience and operational continuity in grid-constrained environments, advancing readiness for utility and industrial applications.
Link to announcement https://www.energy.gov/oe/articles/energy-department-selects-projects-receive-15m-storage-technologies
